New Construction
Coordinate plans, trades, site work, and handover for a new building.
View service ↗MBA Contracting Co organizes residential renovation, commercial contracting, interior construction, and exterior work around the property and project scope. Explore the service that matches your goal, then tell us what you are planning.
Coordinate plans, trades, site work, and handover for a new building.
View service ↗Update rooms and finishes under a clear construction scope.
View service ↗Plan connected changes across the entire home.
View service ↗Renovate around building rules, access, and shared spaces.
View service ↗Plan layout, cabinetry, surfaces, fixtures, and finishes.
View service ↗Plan tile, waterproofing, fixtures, ventilation, and finishes.
View service ↗Improve offices, retail spaces, and other business interiors.
View service ↗Organize tenant improvements around access and turnover.
View service ↗Build partitions, ceilings, flooring, carpentry, and finishes.
View service ↗Set the scope, budget assumptions, logistics, and schedule.
View service ↗Review brick, mortar, and exterior repair work.
View service ↗Plan brick repairs, replacement, and mortar joint work.
View service ↗Review stucco repairs, substrate condition, and finish options.
View service ↗Review roof leaks, repairs, and replacement needs.
View service ↗Address water entry at terraces, walls, and lower levels.
View service ↗Whether you are planning a whole-home renovation, a kitchen or bathroom remodel, a commercial build-out, masonry repairs, roofing, or building waterproofing, begin with the work that matters most to you.
If your project combines several scopes, describe the complete property and every affected area during intake so MBA can evaluate the work as one coordinated plan.
Choose the work you are planning. Plumbing, electrical, and HVAC installations are reviewed as part of a defined construction project with the appropriate qualified trades.
For an existing renovation, review how the building systems connect with the rest of the work.
Need help planning? See the project process, browse service areas, read the planning guides, or contact MBA.
MBA helps New York City owners plan residential renovation, commercial interiors, exterior work, and related construction around the property and project scope. A productive first conversation begins with the property address and type, every room or commercial area affected, the result you want, what must remain, known damage or previous alterations, and any firm timing or occupancy constraints. Photographs and existing documents help the project team evaluate the work more responsibly.
A buildable scope separates required work from optional upgrades and future ideas. It identifies demolition, preparation, new construction, products, finishes, specialty trades, protection, testing, cleanup, and closeout. When a decision is still open, label it as an allowance, alternate, owner selection, or investigation item rather than allowing it to disappear from the price.
New York projects may be governed by a homeowner, landlord, co-op, condominium, management company, alteration agreement, lease, work letter, or agency process. Request the applicable documents before promising a construction date. They may control insurance limits, contractor forms, deposits, work hours, elevator use, delivery routes, protection, noisy work, shutdowns, inspections, and final closeout.
The project team should also determine whether architectural, engineering, permit, licensed-trade, or other professional responsibilities apply. MBA confirms those requirements against the actual scope and documents which party is responsible. Final responsibilities are established through project-specific review and written documents.
Provide each contractor with the same drawings, room list, product information, finish expectations, building rules, and requested alternates. Ask every proposal to distinguish included labor and materials, allowances, exclusions, owner-supplied items, permit or professional costs, protection, disposal, supervision, and closeout. If a bidder assumes something different, the proposal should say so.
Cost is affected by more than square footage. Existing conditions, access, work-hour limits, protection, demolition, substrate preparation, finish complexity, custom fabrication, trade count, delivery limits, inspections, and occupied-space controls can all change the amount. The most useful number is the one attached to a transparent scope.
A reliable schedule starts with approvals and information, then connects procurement, access, demolition, rough work, inspections, close-up, fabrication measurements, finish installation, testing, punch-list work, and closeout. Product lead times and owner decisions should have due dates. A completion promise without these dependencies is only a guess.
Ask which activities can overlap safely and which must occur in sequence. Waterproofing needs preparation and cure time. Countertops may require installed cabinets before templating. Custom glass follows verified finished openings. Painting depends on completed patching and suitable site conditions. Writing those relationships down gives the team a schedule it can manage.
For each important product, record who selects, approves, orders, pays, receives, inspects, stores, installs, protects, and handles warranty questions. Confirm model numbers, dimensions, finishes, quantities, accessories, rough requirements, and delivery dates. Owner-supplied materials can work well when these responsibilities are explicit.
Do the same for trade interfaces. Identify who provides backing, sleeves, penetrations, firestopping, patching, power, plumbing connections, controls, trim, sealants, testing, and final adjustments. Many expensive disputes begin in the space between two scopes rather than inside either one.
Existing buildings may contain damage, uneven substrates, undocumented work, aging systems, inaccessible connections, or assemblies that cannot be verified before demolition. The contract should explain how the condition will be protected, photographed, evaluated, priced, approved, and scheduled after it becomes visible.
Client-requested changes should follow the same disciplined path. Record the description, reason, cost, schedule effect, and authorization before the changed work proceeds, except for immediate measures needed to protect safety or property. A written process keeps field momentum from turning into uncertainty.
An owner may need a project finished by a lease date, move, opening, sale, board deadline, or personal event. That need should be stated early, but it does not remove approval, procurement, inspection, access, or cure-time requirements. The team should test the desired date against the actual dependencies and identify which decisions or products control the critical path.
When the requested timeline is not supported by the available information, responsible planning offers choices: reduce or phase scope, select available products, complete investigation sooner, increase decision speed, or revise the target. The purpose is not to slow the project. It is to prevent an optimistic date from hiding the work required to deliver safely and coherently.
A readiness review should confirm the signed scope, responsible parties, required documents, access plan, insurance, released materials, owner decisions, communication path, payment milestones, and change process. Mobilization is strongest when these items are visible rather than assumed.
Discuss samples, layouts, tolerances, manufacturer instructions, testing, mockups when appropriate, and the standard for accepting visible finishes. Review important work before it becomes concealed. Protect completed surfaces from later trades and record decisions that affect the final result.
Closeout may include punch-list work, cleaning, keys, product literature, warranty information, demonstrations, inspections, signoffs, and building submissions. The exact package should match the contract. A project is easier to finish when every party understands what completion means from the beginning.
MBA uses this information to determine project fit and the next responsible step, which may be a call, document review, site visit, preconstruction engagement, proposal process, or referral when the opportunity falls outside current capacity.
Renovation information often becomes scattered across emails, text messages, marked-up drawings, product links, meeting notes, and verbal decisions. Choose a clear method for recording the current scope, open questions, approvals, selections, and changes. Superseded documents should be identified so a crew or supplier does not act from an old instruction.
For smaller work, a dated scope and selection list may be enough. Larger projects may need drawing logs, submittals, decision registers, meeting notes, and change records. The system should match the complexity of the job, but every project benefits from knowing which information governs the next action.
A renovation may include a kitchen, bathrooms, flooring, walls, ceilings, carpentry, painting, and specialty trades. Exterior work may instead involve brick, mortar, or stucco. Begin with the service that best represents your main goal: a whole-apartment transformation belongs with apartment renovation, a focused kitchen with kitchen remodeling, and a damaged brick wall with brickwork.
Your starting point does not limit the eventual scope. During intake, describe every connected area and trade so MBA can determine whether the work should remain one coordinated project, be phased, or require additional investigation before pricing.
A task list might say demolition, framing, tile, paint, and fixtures. A service scope explains why those tasks are occurring, the conditions they must satisfy, the sequence between them, and who handles each part. The same kind of repair can require different protection, approvals, materials, and closeout in a house, apartment, storefront, or exterior wall.
MBA organizes work around the result the owner needs: a renovated home, an improved commercial space, or a defined masonry repair. The proposal then makes the included tasks and responsibilities clear.
Grouping scopes can improve sequencing, supervision, protection, and communication, but each major component should remain understandable. Proposals can use sections, alternates, allowances, or cost codes so the owner sees how the full project is assembled. This also makes approved changes easier to trace.
When work is phased, the plan should account for repeated mobilization, protection, cleanup, temporary conditions, inspections, and product storage. A phase is useful when it follows real constraints; it should not hide dependencies that will force completed work to be opened again.
MBA reviews residential renovations, kitchen and bathroom remodeling, commercial interiors, masonry, roofing, waterproofing, and related construction projects in New York City. The exact work is defined after reviewing the property and requested scope.
Yes. Describe every affected area and share any available plans, photographs, and building requirements. MBA can review how the scopes connect, which specialists may be needed, and what should be settled before pricing.
Yes. MBA reviews homes, apartments, and suitable commercial spaces. Access, approvals, operating hours, and trade requirements are considered for the particular property.
Yes. Roofing concerns the roof assembly, waterproofing addresses water entry through a defined building assembly, and masonry covers brick, mortar, and related work. A project may involve more than one service after the source and repair boundary are established.
MBA reviews project inquiries in Manhattan, Brooklyn, Queens, the Bronx, and Staten Island. Send the full address so access, scope, timing, and current capacity can be evaluated.
Use the contact page or email estimates@generalcontractorinnyc.com with the property address, work you want done, photographs or plans, building requirements, and desired timing. MBA will review what information is needed for a responsible proposal.
Share the property, project type, current conditions, plans if available, and your target timing. MBA will identify the next useful step.